 |
|
 |
|
|
 |
|
|
 |
 |
 |
 |
 |
 |
Course Improvements
- Green height to lowered gradually through the month of June to an average speed of 9 to 10 on the stimpmeter.
- Verticutting and topdressing of greens scheduled to remove thatch and increase green speeds.
- Cart Paths: Repair drainage and add new gravel. Eroded cart paths have been repaired. New cart paths scheduled in select locations.
- Spraying of tees, fairways and roughs for weeds and clover.
- Sand Traps: New drainage and sand as needed, weed eradication and edging.
- New scorecards and hole signage completed.
|
|
 |
 |
|
|
 |
 |
|
 |